2021 Construction Projects

The following projects are scheduled to be completed in the 2021 Construction Season. This list is subject to change, please check the Project Updates page for project specific scheduling and status updates.

Please call the Engineering Department at (781) 794-8010 or email ctrudel@braintreema.gov with any questions.

Traffic/Intersection Improvements 

Pearl Street/Ivory Street/John Mahar Highway Intersection - Intersection Redesign

King Hill Road/Pond Street/Granite Street Intersection - Intersection Study

Roadway Infrastructure Program 

Roadway

Section

Project Scope

Arnold Street
Aspinwall Road
Braemore Road
Cindy Lane
Commerce Drive
Donata Road
Elm Knoll Road
Eutaw Avenue
Farm Road
Forbes Road
Hawthorn Road
Highview Avenue
Hillsdale Avenue
Holmes Street
Marianne Avenue
Mayflower Road
Middle Street
Miller Street
Old Liberty Road
Pilgrim Road
Proctor Road
Richardi Lane
South Street
Union Street
Warren Avenue
Middle St to River St
Braemore to End
Entire
Entire
Grove St to Cul-de-sac
Entire
Entire
Entire
Entire
Granite St to Grandview Rd
Entire
Entire
Entire
Independence Ave to Washington St
Entire
Entire
Liberty St to Union St
Entire
Entire
Entire
Entire
Entire
Roundabout to Holbrook Line
Ivory St to Washington St
Entire
Roadway Resurfacing
Roadway Resurfacing
Roadway Resurfacing
Roadway and Sidewalk Reconstruction
Roadway and Sidewalk Reconstruction
Roadway Resurfacing
Roadway Resurfacing
Roadway Resurfacing
Roadway and Sidewalk Reconstruction
Roadway Resurfacing
Roadway and Sidewalk Reconstruction
Roadway Resurfacing
Roadway Resurfacing
Roadway and Sidewalk Reconstruction
Roadway Resurfacing
Roadway and Sidewalk Reconstruction
Roadway and Sidewalk Reconstruction
Roadway Resurfacing
Roadway Reconstruction
Roadway and Sidewalk Reconstruction
Roadway Resurfacing
Roadway Resurfacing
Roadway Resurfacing
Sidewalk Reconstruction
Roadway Resurfacing

Water Projects 

Replace the watermains, reclaim the roadways and place binder on the following streets. 

  • Glenrose Avenue (Entire)
  • Argyle Road (Entire)
  • Railroad Street (Entire)
  • Hooker Street (Entire)
  • River Street (Entire)
  • Cain Avenue (Bradford St to Water St)
  • Bradford Road (Wildwood Ave to Cain Ave)
  • Plain Street (Garden Park to Grove St) - services only 
  • Hancock Street (450' between Smith St and Highland Ave) - services only 
  • Commercial Street (Front St to Holden Street)
  • Middle Street (Cleveland Ave to Elm St)
  • Quincy Avenue (Howard St to Quincy Line)
  • Howard Street (Hayward St to Quincy Line)

Sewer Projects

Sewer Inflow and Infiltration Reduction Project, Years 8 and 9

Braintree performs sewer maintenance and repairs in a systematic two-year approach, the first year is an "investigation year" and includes cleaning and televising the inside of municipal sewer pipes which provides necessary system maintenance and identifies any issues that require further attention which can be addressed in the following "Rehabilitation Year". The rehabilitation work includes the lining of sewer pipes and manholes and sealing of joints and other defects with the goal of reducing the amount of groundwater infiltrating into the municipal sewer system. The majority of this work is trenchless and non-invasive, and often, residents will only see contractor vehicles parked in the middle of the street with access to the sewer system through manholes. This is a fairly expansive program that rehabilitates tens of thousands of feet of pipe in various sections of town. List of roads scheduled to be investigated and rehabilitated this year can be found at the links below.

Street Listing - Sewer Rehabilitation Year 8 
Street Listing - Sewer Investigation Year 9

Howard Street Pump Station 

The upgrade and modernization of an aging sewer pump station, including structural repairs to the rood of the structure and replacement of pumps, channel grinders and equipment. The project also includes the installation of a flow meter. Work is expected to be completed this Spring.

Miscellaneous Projects 

Elder Affairs Parking Area

Resurface the existing parking area and expand the parking lot. This project is currently in the design phase.